Renewable natural gas company Viridi Energy had acquired a biosolids digester plant in Brunswick, Maine that it intends to transform into a waste-to-RNG facility, according to a March 19 press release.
Virdi will use anaerobic digestion to transform biosolids into enough energy to heat more than 3,000 homes for a year, the company said.
Casella Waste Systems Inc., a regional solid waste, recycling, and resource management services company, will manage feedstock collection and delivery logistics for an estimated 85,000 tons of biosolids per year collected from a network of wastewater treatment plants. Once processed, Casella will transport the more stable, post-process digestate to landfill in a form that preserves landfill capacity, lessens the need for stabilization material and reduces transportation distances.
Viridi is currently conducting siting, permitting, and environmental due diligence at the Brunswick site. Retrofit construction of the Brunswick facility is expected to be complete by the second half of 2025, with full operations slated to commence in 2026.
Recommended Reading
US Oil, Gas Rig Count Falls to Lowest Since January 2022
2024-05-03 - The oil and gas rig count, an early indicator of future output, fell by eight to 605 in the week to May 3, in the biggest weekly decline since September 2023.
Pemex Reports Lower 2Q Production and Net Income
2024-05-03 - Mexico’s Pemex reported both lower oil and gas production and a 91% drop in net income in first-quarter 2024, but the company also reduced its total debt to $101.5 billion, executives said during an earnings webcast with analysts.
Chouest Acquires ROV Company ROVOP to Expand Subsea Capabilities
2024-05-02 - With the acquisition of ROVOP, Chouest will have a fleet of more than 100 ROVs.
SLB, OneSubsea, Subsea 7 Sign Collaboration Deal with Equinor
2024-05-02 - Work is expected to begin immediately on Equinor’s Wisting and Bay Du Nord projects.
SilverBow Makes Horseshoe Lateral in Austin Chalk
2024-05-01 - SilverBow Resources’ 8,900-foot lateral was drilled in Live Oak County at the intersection of South Texas’ oil and condensate phases. It's a first in the Chalk.