The following information is provided by TenOaks Energy Advisors. All inquiries on the following listings should be directed to TenOaks Energy Advisors. Hart Energy is not a brokerage firm and does not endorse or facilitate any transactions.
KJ Energy LLC has retained TenOaks Energy Advisors for the sale of its operated portfolio located in East Texas. The package includes a current production net rate of 52 MMcfe/d.
Opportunity highlights:
• Majority HBP position in the heart of the prolific horizontal Cotton Valley Trend in East Texas
• Largely mature production base with a current net rate of 52 MMcfe/d (75% gas)
- PDP PV10: $123MM
- NTM PDP cash flow: $27MM
• Upside features >185 horizontal drilling locations targeting multiple zones with attractive economics (~50% IRR at current strip)
- Acreage footprint ideal for facilitating long lateral development
• Ample infrastructure and takeaway capacity in place to accommodate substantial growth
Bids are due April 18 at noon CST. For complete due diligence, please visit tenoaksenergyadvisors.com or email B.J. Brandenberger, partner, at bj.brandenberger@tenoaksadvisors.com or Lindsay Sherrer, partner, at Lindsay.sherrer@tenoaksadvisors.com.
Recommended Reading
SM Energy Targets Prolific Dean in New Northern Midland Play
2024-05-08 - KeyBanc Capital Markets reports SM Energy’s wells “measure up well to anything being drilled in the Midland Basin by anybody today.”
Vår Selling Norne Assets to DNO
2024-05-08 - In exchange for Vår’s producing assets in the Norwegian Sea, DNO is paying $51 million and transferring to Vår its 22.6% interest in the Ringhorne East unit in the North Sea.
Crescent Energy: Bigger Uinta Frac Now Making 60% More Boe
2024-05-08 - Crescent Energy also reported companywide growth in D&C speeds, while well costs have declined 10%.
SLB OneSubsea JV to Kickstart North Sea Development
2024-05-07 - SLB OneSubsea, a joint venture including SLB and Subsea7, have been awarded a contract by OKEA that will develop the Bestla Project offshore Norway.
Chevron, Total’s Anchor Up and (Almost) Running
2024-05-07 - During the Offshore Technology Conference 2024, project managers for Chevron’s Anchor Deepwater Project discussed the progress the project has made on its journey to reach first oil by mid-2024.