KROHNE Inc. showcased its pipeline measurement solutions at the 88th International School of Hydrocarbon Measurement in Oklahoma City, Oklahoma. KROHNE demonstrated its OPTIMASS 6400 mass flowmeter, ALTOSONIC V and ALTOSONIC V12 ultrasonic flowmeters, in addition to the Summit 8800 Digital Flow Computer.
The OPTIMASS 6400 included advanced entrained gas management, enabling it to handle entrainment up to 100%. This feature allows the OPTIMASS 6400 to adjust to variations in fluid properties and make dynamic density measurements not possible with other mass flowmeters. The ALTOSONIC V and V12 ultrasonic flowmeters provide similar benefits over traditional flowmeters. With no moving parts, the ultrasonic flowmeters have increased longevity and require no recalibration due to wear or changes in fluid density and viscosity.
Recommended Reading
NAPE: Chevron’s Chris Powers Talks Traditional Oil, Gas Role in CCUS
2024-02-12 - Policy, innovation and partnership are among the areas needed to help grow the emerging CCUS sector, a Chevron executive said.
Beach Town Corpus Christi Grows into America’s Top Energy Port
2024-01-16 - The Port of Corpus Christi is the U.S.’ largest energy export gateway and in terms of total revenue tonnage as increased midstream investments have opened export markets for the prolific Permian Basin.
Gushing, Ohio: EOG Joins Ascent, Encino in Top Oil Wells
2024-01-22 - EOG’s latest wells in its new Ohio oil play are rolling into state public records, while Ascent Resources and Encino Energy are reporting the biggest producers. All three are landing 3-milers. Some are 3.5 miles.
Chevron Hunts Upside for Oil Recovery, D&C Savings with Permian Pilots
2024-02-06 - New techniques and technologies being piloted by Chevron in the Permian Basin are improving drilling and completed cycle times. Executives at the California-based major hope to eventually improve overall resource recovery from its shale portfolio.
ONGC’s M Field Starts Production in Bay of Bengal
2024-01-09 - ONGC’s M Field represents the second phase of the larger 98/2 Block development project which is expected to reach peak production of 45,000 bbl/d and 10 MMcm/d.