Statoil’s LNG plant at Hammerfest, Norway, is back online as planned after being shut down since Oct. 14.
After a scheduled shutdown earlier this year, a pressure build-up, which may be related to icing in the plant, was discovered.
During the just completed shutdown, parts of the plant were heated up and dried. Gas and liquid samples have been taken for analysis, and tests have been conducted in order to find the cause of pressure build-up. The plant now works as intended and production is back to normal, according to Statoil.
Recommended Reading
Pitts: Heavyweight Battle Brewing Between US Supermajors in South America
2024-04-09 - Exxon Mobil took the first swing in defense of its right of first refusal for Hess' interest in Guyana's Stabroek Block, but Chevron isn't backing down.
Rystad: More Deepwater Wells to be Drilled in 2024
2024-02-29 - Upstream majors dive into deeper and frontier waters while exploration budgets for 2024 remain flat.
CNOOC Makes 100 MMton Oilfield Discovery in Bohai Sea
2024-03-18 - CNOOC said the Qinhuangdao 27-3 oilfield has been tested to produce approximately 742 bbl/d of oil from a single well.
CNOOC Finds Light Crude at Kaiping South Field
2024-03-07 - The deepwater Kaiping South Field in the South China Sea holds at least 100 MMtons of oil equivalent.
Eni Finds 2nd Largest Discovery Offshore Côte d’Ivoire
2024-03-08 - Deepwater Calao Field’s potential resources are estimated at between 1 Bboe and 1.5 Bboe.