A fire that broke out on a Petróleos Mexicanos (Pemex) platform in the Gulf of Mexico killed one worker and injured 13 others, Mexico’s state-owned oil company said.
Pemex reported the fire on April 6 at its Akal-B Process Center (Akal-B1) in the Campeche Sound in the Gulf of Mexico.
Several of the injured workers are in serious condition, including one worker from Pemex and another from Coter, a Mexico-based company that specializes in the installation of removable thermal insulation.
Initially, Pemex had reported nine workers injured, all with non-serious injuries. The initial statement also said that the fire only lasted for approximately 15 minutes—from 4:48 p.m. to 5:04 p.m.—before being controlled by the company’s emergency response plan.
Pemex said that the fire broke out in an area where pipelines that handle gas are located. The company did not detail the extent to which the blaze would affect supplies. Pemex said an inspection and evaluation of the area continues to discover the fire’s cause and to restart operations of the process center.
RELATED
Recommended Reading
Chevron Hunts Upside for Oil Recovery, D&C Savings with Permian Pilots
2024-02-06 - New techniques and technologies being piloted by Chevron in the Permian Basin are improving drilling and completed cycle times. Executives at the California-based major hope to eventually improve overall resource recovery from its shale portfolio.
Barnett & Beyond: Marathon, Oxy, Peers Testing Deeper Permian Zones
2024-04-29 - Marathon Oil, Occidental, Continental Resources and others are reaching under the Permian’s popular benches for new drilling locations. Analysts think there are areas of the basin where the Permian’s deeper zones can compete for capital.
Santos’ Pikka Phase 1 in Alaska to Deliver First Oil by 2026
2024-04-18 - Australia's Santos expects first oil to flow from the 80,000 bbl/d Pikka Phase 1 project in Alaska by 2026, diversifying Santos' portfolio and reducing geographic concentration risk.
Sinopec Brings West Sichuan Gas Field Onstream
2024-03-14 - The 100 Bcm sour gas onshore field, West Sichuan Gas Field, is expected to produce 2 Bcm per year.
Proven Volumes at Aramco’s Jafurah Field Jump on New Booking Approach
2024-02-27 - Aramco’s addition of 15 Tcf of gas and 2 Bbbl of condensate brings Jafurah’s proven reserves up to 229 Tcf of gas and 75 Bbbl of condensate.